A global aerospace manufacturer sought a service provider that could assess current operations and equipment to make recommendations for increased efficiency. The high peak demands at the facility were a pressing issue, reaching over $16,000 per month across three plants, which accounted for approximately 20% of the billed costs.

Green Econome identified lighting, HVAC, and thermostat systems that could be upgraded for financial and energy savings. The retrofit included new ballast bypass LEDs throughout the interior of all three plants, occupancy sensors to minimize burn hours in unoccupied space, and wireless, programmable thermostats that would allow for remote monitoring and control. Additionally, Four HVAC units serving Plant 1 were replaced with smaller, more efficient units, saving the plant 18 tons of cooling annually.

Client

GLOBAL AEROSPACE COMPANY

Property Type

MULTI-BUILDING MANUFACTURING CAMPUS

Project Type

ENERGY AUDIT, LED LIGHTING RETROFIT, WIRELESS THERMOSTATS, HVAC REPLACEMENT

Incentive

LADWP CLIP

PROJECT RESULTS

PRE AND POST-INSTALLATION COMPARISONS (average across three plants)

28%

Energy (kWh) Reduction

25%

Energy Cost Reduction

$267,221

Incentives Received

719,232

Lighting kWh Reduction

1.2 Years

Payback Period

18%

Greenhouse Gas Reduction